= FMEA Blocking Gates Implementation
:doctype: article
:toc:
:toc-placement: preamble
:sectnums:
== Document Information
[cols="1,3"]
|===
|Document Version|1.0.0
|Document Date|2025-11-03
|Implementation|GitHub Workflows + Jenkins (Phase 2)
|Status|FMEA blocking gates active in GitHub, Jenkins pending
|===
== Overview
This document describes the **FMEA Blocking Gate** mechanism that prevents CAPAs, ECRs, and ECOs from proceeding without Failure Mode & Effects Analysis (FMEA) approval.
**Core Concept:** FMEA acts as a mandatory side trip — when required, a ticket is blocked until all stakeholders approve the FMEA. Stakeholder signatures are collected post-submission (in comments), then FMEA is routed to in_basket for formal governance record.
== When FMEA is Required
=== CAPA (Auto-detected)
FMEA **Required** if:
1. **Severity = CRITICAL** (any type)
- Crashes, segfaults, data loss, security issues
2. **Severity = MAJOR + Regression flag**
- Major defect that breaks previously working feature
3. **Keywords in title/description**
- "architecture", "design", "data integrity", "safety"
=== ECR (Explicit field)
ECR submission includes **FMEA Decision** field with options:
- `no` - FMEA not required
- `optional` - FMEA recommended but not mandatory
- `required` - FMEA mandatory before proceeding
=== ECO (Follows ECR)
ECO inherits FMEA decision from related ECR:
- If related ECR has FMEA decision = `required`, ECO is blocked
- FMEA must be approved before ECO implementation
== Blocking Flow
[source,text]
----
1. CAPA/ECR/ECO Created
2. Auto-Assessment of FMEA Requirement
3. If FMEA Required:
├─ Add fmea-required + blocked labels
├─ Comment: "BLOCKED: FMEA Required"
├─ Link to FMEA template
└─ Set SLA deadline (24 hours to file FMEA)
4. Developer/Manager Files FMEA Issue
├─ Links to parent CAPA/ECR/ECO
├─ Defines failure modes, risk assessment
├─ Proposes mitigations
└─ Lists required stakeholders
5. Stakeholder Review (parallel)
├─ QA Lead review
├─ Architecture review
├─ Security review (if applicable)
└─ Each posts approval comment
6. All Stakeholders Approve
├─ QA Lead verifies completeness
├─ Routes FMEA to in_basket/Fmea/
├─ Collects digital signatures (comment-based)
└─ Posts final approval comment
7. Unblock Parent Ticket
├─ Remove blocked + fmea-required labels
├─ Parent issue can proceed
└─ Implementation can begin
----
== Approval Process
=== Stakeholder Approval Comment Format
Each stakeholder posts:
[source]
----
✅ APPROVED
Stakeholder: [Your name]
Role: [Your title - QA Lead, Architecture, etc.]
Date: [Approval date]
Review Scope: [What you reviewed]
Notes: [Any conditions or concerns]
----
=== QA Lead Final Approval
After all stakeholders approve, QA Lead posts:
[source]
----
## ✅ FMEA Approved by All Stakeholders
All required stakeholders have reviewed and approved.
**Approvals Collected:**
- @stakeholder1 (QA Lead) ✅
- @stakeholder2 (Architecture) ✅
- @stakeholder3 (Security) ✅
**Final Decision:** APPROVED
**Risk Level:** Acceptable with mitigations
### Next Steps
1. FMEA routed to: in_basket/Fmea/FMEA-[ID]_SUBMISSION.adoc
2. Unblocking parent issue (removing fmea-required label)
3. Digital signatures collected in comments
4. Implementation can now proceed
**Parent Issue:** #[number]
**FMEA Issue:** [This issue]
**In_basket:** StarForth-Governance/in_basket/Fmea/
----
== In_basket Routing (After Approval)
Once FMEA is approved by all stakeholders:
=== 1. QA Lead Routes to Governance
**Command (from StarForth-Governance repo):**
```bash
mkdir -p in_basket/Fmea/
cp [path/to/fmea/details] in_basket/Fmea/FMEA-[YYYYMMDD]_[PARENT_ISSUE_ID].adoc
```
=== 2. Digital Signature Collection
QA Lead collects signatures by copying approval comments to final document:
[source,adoc]
----
= FMEA Submission: [Title]
:fmea-id: FMEA-20251103-CAPA-042
:parent-issue: #42
:submission-date: 2025-11-03
== Stakeholder Approvals
[cols="1,1,1,1"]
|===
|Stakeholder|Role|Date|Signature
|Jane Smith|QA Lead|2025-11-03|✅
|Bob Jones|Architecture|2025-11-03|✅
|Alice Lee|Security|2025-11-03|✅
|===
[NOTE]
Signatures collected from GitHub issue comments #42 (CAPA), #45 (FMEA)
Digital signatures preserved in git audit trail.
----
=== 3. Unblock Parent Issue
```bash
# Remove blocking labels
gh issue edit #42 --remove-label fmea-required,blocked
# Add comment confirming unblock
gh issue comment #42 --body "✅ FMEA Approved. Issue unblocked. Implementation can proceed."
```
=== 4. Governance Record
FMEA now appears in `in_basket/Fmea/` awaiting:
- QA triage (per INTAKE_PROCEDURES.adoc Fmea_Submissions pathway)
- SLA: 10 business days for review/approval
- Disposition: Move to [VAULT]/Reference/Processes/ or archive if rejected
== Stakeholder Responsibilities
=== QA Lead
**During FMEA Review:**
- Review failure modes for completeness
- Assess mitigations for quality/safety coverage
- Verify all required stakeholders invited
- Set approval deadline (typically 5 business days)
**After All Approve:**
- Verify completeness of approvals
- Route to in_basket
- Unblock parent issue
- Comment: "FMEA approved, proceeding with implementation"
=== Architects/Technical Leads
**Review Scope:**
- Design impact assessment
- Mitigation technical feasibility
- Integration with existing architecture
**Approval Means:**
- This design change is architecturally sound
- Proposed mitigations are sufficient
- Implementation can proceed safely
=== Security Review (if applicable)
**Review Scope:**
- Security implications of change
- Vulnerability introduction risk
- Mitigation adequacy for security baseline
**Approval Means:**
- Change does not introduce security risks
- Mitigations address identified threats
- Security baseline maintained
== Timeline & SLAs
[cols="1,1,1"]
|===
|Activity|SLA|Owner
|File FMEA (after parent blocked)|24 hours|Developer/Manager
|Stakeholder review window|5 business days|QA Lead sets deadline
|All stakeholders approve|By deadline|Stakeholders
|QA Lead routes to in_basket|2 business days|QA Lead
|Digital signatures collected|Same day as routing|QA Lead
|Unblock parent issue|Same day as approval|QA Lead
|in_basket FMEA triage|10 business days|Governance QA
|Disposition to [VAULT]|Per governance decision|QA/Governance
|===
== Jenkins Integration (Phase 2)
Jenkins jobs will also check FMEA requirement before allowing pipeline progression:
[source,groovy]
----
// In Jenkins job (devl/test/qual stages)
def fmeaRequired(String issueBody) {
return issueBody.contains("fmea-required") ||
issueBody.contains("FMEA: required")
}
def isFmeaApproved(String issueNumber) {
// Check GitHub issue for FMEA approval
// Look for comments from all required stakeholders
// Return true only if ALL stakeholders approved
}
stage('Check FMEA Gate') {
when { expression { fmeaRequired(env.ISSUE_BODY) } }
steps {
script {
if (!isFmeaApproved(env.ISSUE_NUMBER)) {
error("FMEA required but not approved. Block pipeline.")
}
}
}
}
----
Details: See JENKINS_GOVERNANCE_INTEGRATION.adoc (Phase 2 section)
== Troubleshooting
=== "FMEA is blocked but I don't think it should be"
**Solution:** Contact QA Lead to review FMEA requirement assessment. If legitimate exception, QA Lead can remove blocking labels manually with documentation.
=== "Stakeholders not responding to FMEA review"
**Solution:**
1. QA Lead escalates to stakeholder manager
2. Extend deadline if needed (document reason in FMEA)
3. If critical path: proceed with PM approval + risk acceptance document
=== "FMEA approved but parent issue still blocked"
**Solution:**
1. Verify all stakeholders approved (check comments)
2. QA Lead manually removes fmea-required + blocked labels
3. Post comment: "FMEA approved, unblocking issue"
== References
- 04-FMEA_PROCESS.adoc - Complete FMEA procedure
- CAPA_PROCESS.adoc - CAPA workflow with FMEA gate
- ECR_PROCESS.adoc - ECR FMEA decision field
- ECO_PROCESS.adoc - ECO inherits FMEA from ECR
- INTAKE_PROCEDURES.adoc - Fmea_Submissions pathway (SLA: 10 business days)
- .github/workflows/fmea-submission.yml - Workflow implementation
- .github/ISSUE_TEMPLATES/fmea.yml - FMEA template
== Sign-Off
**Implemented By:** Claude Code (AI Assistant)
**Date:** 2025-11-03
**Status:** GitHub workflows active, Jenkins Phase 2 pending
**Approval Authority:** QA Lead / Architecture