%% SCRAP: scratch/ci-cd/FMEA_BLOCKING_GATES
%% SOURCE: docs/working/scratch/ci-cd/FMEA_BLOCKING_GATES.adoc
%% STATUS: HISTORICAL
%% FITS: none
%% EDITORIAL: lifted — prose rewritten to press voice
\section{FMEA Blocking Gate Mechanism}
The FMEA Blocking Gate mechanism prevents Corrective Action and Preventive Actions (CAPAs),
Engineering Change Requests (ECRs), and Engineering Change Orders (ECOs) from advancing
without a completed Failure Mode and Effects Analysis. The gate treats FMEA as a mandatory
side trip: any ticket requiring analysis is held until all designated stakeholders approve
the FMEA submission, at which point the governance record is routed to the
\texttt{in\_basket} queue and the parent ticket is released.
\subsection{Trigger Conditions}
The system auto-detects FMEA requirements under the following conditions.
\paragraph{CAPA triggers.}
\begin{itemize}
\item Severity is CRITICAL (crashes, segfaults, data loss, security issues).
\item Severity is MAJOR and the regression flag is set.
\item Title or description contains the keywords \emph{architecture}, \emph{design},
\emph{data integrity}, or \emph{safety}.
\end{itemize}
\paragraph{ECR triggers.}
The ECR submission form carries an explicit \textbf{FMEA Decision} field:
\texttt{no}, \texttt{optional}, or \texttt{required}.
\paragraph{ECO triggers.}
An ECO inherits the FMEA decision from its related ECR. If the ECR decision is
\texttt{required}, the ECO is blocked until FMEA approval.
\subsection{Blocking Workflow}
\begin{enumerate}
\item CAPA, ECR, or ECO is created.
\item Auto-assessment determines whether FMEA is required.
\item If required: \texttt{fmea-required} and \texttt{blocked} labels are applied;
a blocking comment is posted; the FMEA template link is attached; a 24-hour
SLA deadline is set for filing the FMEA issue.
\item The developer or manager files a separate FMEA issue, links it to the parent
ticket, defines failure modes and mitigations, and lists required stakeholders.
\item Stakeholders review in parallel (QA Lead, Architecture, Security if applicable)
and each posts an approval comment.
\item After all stakeholders approve, the QA Lead verifies completeness, routes the
FMEA to \texttt{in\_basket/Fmea/}, collects digital signatures from the approval
comments, and posts a final approval comment.
\item The QA Lead removes the \texttt{blocked} and \texttt{fmea-required} labels.
The parent ticket proceeds to implementation.
\end{enumerate}
\subsection{Service Level Agreements}
\begin{center}
\begin{tabular}{lll}
\toprule
Activity & SLA & Owner \\
\midrule
File FMEA after block & 24 hours & Developer / Manager \\
Stakeholder review window & 5 business days & QA Lead sets deadline \\
QA Lead routes to \texttt{in\_basket} & 2 business days & QA Lead \\
\texttt{in\_basket} FMEA triage & 10 business days & Governance QA \\
Disposition to Vault & Per governance decision & QA / Governance \\
\bottomrule
\end{tabular}
\end{center}
\subsection{Jenkins Integration (Phase 2)}
Phase 2 of the CI/CD rollout extends the FMEA gate into Jenkins pipeline jobs. Each
pipeline stage queries the associated GitHub issue for the \texttt{fmea-required} label
and calls a helper that scans issue comments for stakeholder approval signatures. A stage
fails—and pipeline promotion is blocked—if FMEA is required but not fully approved.
%% TODO(bob): confirm whether Jenkins Phase 2 was ever completed or remains planned.